Transportation Works:

Past Experience in Transportation

 

Projects and clients

  • Transportation of 12 turbines 125 Ton from Alexandria to High Dam Station in Aswan.
  • Transportation of the old turbines 137 Ton to Assuit.
  • Transportation of the transformers to the sites in all Egypt and unloading them on the foundations.
  • Transportation of 3 Alstom transformer 125 Ton from Al-Arish to Sharm Al-Shiekh.
  • Transportation of 18 MAN Diesel Units 2.5 M.W. to New Valley and Sinai.
  • Transportation of Gas Turbine Units 170 Ton to their sites.

 


PETROJET

  • Five odd packages 247 Ton with 21M x 5,5M x 6M each.
  • Cooperate with NOSCO Co. to transport a package of 427 Ton from El-Dekheila Port to Alexandria.
  • Transportation of a package 170 Ton from Central Workshop at El-Kattameia to Petrochemicals at   Alexandria with 35M length and two package 125 Ton each.
  • Transportation of a package 135 Ton from Central Workshop at El-Kattameia to Ras Bakr with 30M length.
  • Transportation of three Bullets 150 Ton from Central Workshop at El-Kattameia to Gamasa with 29M x 6 M x7 M.
  • Control Room 100 Ton with 16 Mx12 Mx8 M to JABCO Co.

 

The Egyptian Antiquities Organization (EAO)

  • Transportation of heritage Obelisk from San El-Hagar to Cairo Airport.

 

Egyptian International Ferries

  • Transportation of hydrofeel from Aswan Port to High Dam Lake.

 

SAN MISR Co.

  • Transportation of a package of 21 M length, 3,7M width and 4, 6 M height from Jabco site to Ras Shokeer at Eastern desert.

 

MEDOUR Co.

  • Transportation of a package140 Ton with diameter 8 M and 10M height from El-Dekheila Port to Alexandria.

 

NOSCO Co.

  • Transportation of transformer 250 Ton for Sidi Krir Power Station

 

DEUGRO Co.

  • Transportation of transformer 118 Ton form Alexandria to Al-Ezz factory at Al-Ain El-SoKhna.

 

El-WAFAA Co.

  • Transportation of transformer 136 Ton for Al-Asher Substation
  • Transportation of transformer 136 Ton for Sharm Al-Sheikh Substation
  • Transportation of transformer 136 Ton for El-Kalyobeia Substation.

 

ARAB CONTRACTORS Co.

  • Transportation of steel partition 180 Ton for Tunnel Metro with 43M length and 2.5M height from Marine workshop at Helwan to El-Giza Squire.
  • Transportation of special partition 180 Ton with 42M length, 5.5 M width and 2M height from Marine workshop at Helwan to Eastern Berdeen Bridge.
  • Transportation of Two special partition 140 Ton with 38M length each from Marine workshop at Ismailia to El-Nozha Bridge.
  • Transportation of Two special partitions 180 Ton with 48M length each from Marine workshop at Ismailia to El-Nozha Bridge.
  • Transportation of Four Boats from Marine workshop at Helwan to Susie Port.
  • Transportation of Concrete partition to Lebanon Squire.

 

EGYTRANS Co.

  • Transportation of transformer 260 Ton form Port-said Port to Oyoun Mossa Power Station.
  • Transportation of Borsallin package 250 Ton with length 90 M from El-Dekheila port to Petrochemicals Factory.
  • Transportation of Two packages (218 Ton and 208 Ton) from Dumyat to liquidate gas Factory.
  • Transportation of transformer 300 Ton form Alexandria to El-Nobariya Power Station.
  • Transportation of Four Turbines 300 Ton and Four Transformers 300 Ton form El-Dekheila Port Alexandria to El-Nobariya Power Station.
  • Transportation of Four special partition of  bridge with 48 M length for each from METALCO to the International Road
  • Pull turbine form Al-Adabia Port to El–Koraimat Power Station.
  • Pull transformer form Al-Adabia Port to El–Koraimat Power Station.

 

KAHROMIKA

  • Transportation of two condensers from Dumyat Port to Talkha Power Station.
  • Transportation of generators 240 Ton from Dumyat Port to Talkha Power Station .