Overhead Transmission Lines (OHTL):
Libya
3634kms. Of 66 kv. Double Circuit Transmission lines complete with foundations.115 kms. Of 220 KV. Double Circuit Transmission lines complete with foundations.
570 kms. Of 400 KV. Transmission lines complete with foundations.
Morocco
288 kms. Of 225 KV.Double Circuit Transmission lines complete with foundations.176 kms. Of 400 KV. Transmission lines complete with foundations.
Algeria
31 kms. Of 60 KV. Double Circuit Transmission lines complete with foundations.160 kms. Of 220 KV. Double Circuit Transmission lines complete with foundations.
160 kms. Of 400 KV. Transmission lines complete with foundations.
Yemen
123.5 kms. Of 132 KV. Double Circuit Overhead Transmission lines Bajil – Suq Abs .Local
100 kms. of 500kv. Double circuit complete with foundation
Changing the insulators of (2310 kms) of the 500 KV. transmission line from Aswan High Dam to Cairo .
2042Kms. of 220 KV. Double Circuit transmission lines complete with foundations
130 kms. of 132 KV. Double Circuit transmission lines complete with foundations
1054 kms. of 66 KV. Double Circuit transmission lines complete with foundations.
340 kms. of 33 KV. Double Circuit transmission lines complete with foundations.
98.780 kms. of 66 KV. Cables complete with joints including 8.280 kms. crossing the Nile and some canals
Most of these transmission lines were executed in rocky, sandy and muddy lands. Due to many difficulties which appeared during the execution, abnormal efforts were made to overcome these difficulties.